|
The Reconditioning Process This process takes approximately 2-4 weeks from start to finish depending on the size of the machine.
Every Holzher edgebander is refurbished regardless of size and tooling and is treated the same way as the 2 examples given below
Holzher 1404 before  
All machines are dismantled with much care taken in the replacement of bearings in all motors, the pressure roll system is fully over hauled and the glue system is replaced with new.
With a new fresh look to the machine even you would not be able to tell that this was originally in a poor state.
Holzher 1405 step by step process
Holzher 1405 after all parts have been refurbished now the machine is reassembled
If you have any questions regarding this process, please call us or visit and view a machine in progress.
|